Filtrer les résultats
Sites
Type(s)
-
Units of measurement for radioactivity
Units of measurement for radioactivity The quantities of radioactive substances and ionising radiation doses are measured using three different units:
-
“Mat LU-Alert gesäis du et kommen”: Roll-out of the new public warning and information system “LU-Alert”(17.10.2024)
“Mat LU-Alert gesäis du et kommen”: Roll-out of the new public warning and information system “LU-Alert”(17.10.2024) “Mat LU-Alert gesäis du et kommen
-
Management and coordination bodies
Management and coordination bodies The plan is comprised of four alert levels that correspond to the respective threat levels. The VIGILNAT plan sets
-
Nuclear sites
The three countries that neighbour the Grand Duchy of Luxembourg all have nuclear installations located within a 100 km radius that produce over 10,
-
Working visit by the Benelux SG to the HCPN (24.10.2024)
Working visit by the Benelux SG to the HCPN (24.10.2024) A fruitful exchange between representatives of the General Secretariat of the Benelux Union,
-
Coordination of counter-terrorism
Following the terrorist attacks of 11 September 2001 in the United States of America, the Council of Government decided to reactivate the National
-
Monitoring in Luxembourg
In the Grand Duchy of Luxembourg, ambient (environmental) radioactivity - both natural and artificial - has been continually measured since 1983 by
-
Emergency planning zones
Emergency planning zones In order to ensure adequate management in the event of a nuclear emergency and the best possible protection of the public
-
General information
The global threat of terrorism posed by groups or individuals is becoming ever more varied and complex. Terrorism is a global threat that respects no
-
Stakeholders and management bodies
Stakeholders and management bodies The CBRN ERP can only be triggered if the VIGILNAT planassesses the threat at either level 3 or level 4, with a
-
Primary and secondary planning zones
Primary and secondary planning zones The country is divided into a primary planning zone and a secondary planning zone. Primary planning zone
-
Drinking water
This section provides information on the arrangements for an emergency response in the event of a significant disruption in the drinking water supply
-
Objectives of the plan
The Ebola emergency response plan was developed under the guidance of the High Commission for National Protection (Haut-Commissariat à la protection
-
Stakeholders
The Crisis Cell (Cellule de crise) operates throughout the duration of the crisis and until the situation returns to normal. Radiological Evaluation
-
Water Management Authority
Water Management Authority Legislation creating a Water Management Authority (Administration de la gestion de l'eau) was adopted on 28 May 2004. The
-
Treatment and vaccines
There are few medicines currently available that can be administered specifically to treat the Ebola virus disease. The molecule Favipiravir (T-705)
-
Warning the population
In a nuclear emergency, the population is alerted by an alarm signal triggered by the Emergency Call Centre (112). To avoid confusion with the 'fire
-
Transmission risk levels
Transmission risk levels Depending on the type of contact, three levels of transmission risk can be distinguished (defined by the French National
-
Reception centres
Individuals who are unable to find refuge outside the evacuation zones on their own will be temporarily accommodated in reception centres set up by
-
Government plan
Objectives of the Emergency Response Plan This Emergency Response Plan defines the actions that the Government should take in the event of a
- Page précédente
- ...
- Page 153
- Page 154
- Page 155
- Page 156
- Page 157
- ...
- Page suivante